At UDS CORP , Projects require:
o A careful analysis of the work to be performed as well as the existing infrastructure
o Specific planning based on the most suitable feasibility study
o A high degree of experience and “know-how”
o Execution and coordination within tight time limits
o Dedication and perfection to deliver a complete Job
We are well prepared and employ experienced professionals to handle even the most difficult projects.
Few of our projects in Iraq:
1- Rehabilitation of four air cooled water chillers type YORK servicing four turbines type GE TM -2500 in Baiji Gas power station.
2- Installation of fogging system manufactured by MEE industries in:
a- Najaf Gas Power Station – 2 frame 9E.
b- Taza Gas Power Station – one Siemens V 64.
c- Mullah Abdulah Gas Power Station - 6 Unites of GE frame 6 .
d- South Baghdad 2 Gas power station – 8 unites of GE frame 5 .
e- Dora Gas Power Station – 4 unites of GT 20 ..
3- Cooling system by media for dry air coolers (Oil coolers) for 6 unites of GE frame 6 and 6 unites of GE frame 5 in Mullah Abdulah Gas Power station
4- Pulse Cleaning System
a- Supplying , Installation and Operation of pulse cleaning system for two Gas Turbine Unites (SGT800) at Rasheed Power Station (Baghdad).
b-Supplying , Installation and Operation of pulse cleaning system for two Gas Turbine Unites (F5) at Taji Power Station (Baghdad).