Projects


At UDS CORP , Projects require:

o A careful analysis of the work to be performed as well as the existing infrastructure
o Specific planning based on the most suitable feasibility study
o A high degree of experience and “know-how”
o Execution and coordination within tight time limits
o Dedication and perfection to deliver a complete Job

We are well prepared and employ experienced professionals to handle even the most difficult projects.

Few of our projects in Iraq:

 

 

1-      Rehabilitation of four air cooled water chillers type YORK servicing four turbines type GE TM -2500 in Baiji Gas power station.

2-      Installation of fogging system manufactured by MEE industries in:

a-      Najaf Gas Power Station – 2 frame 9E.

b-      Taza Gas Power Station – one Siemens V 64.

c-       Mullah Abdulah Gas Power Station   - 6 Unites of GE frame 6 .

d-      South Baghdad 2 Gas power station – 8 unites of GE frame 5 .

e-       Dora Gas Power Station – 4 unites of GT 20 ..

3-      Cooling system by media for dry air coolers (Oil coolers) for 6 unites of GE frame 6 and 6 unites of GE frame 5 in Mullah Abdulah Gas Power station

4- Pulse Cleaning System

                     a- Supplying , Installation and Operation of pulse cleaning system for two Gas Turbine                                Unites (SGT800) at Rasheed Power Station (Baghdad).

                     b-Supplying , Installation and Operation of pulse cleaning system for two Gas Turbine                                Unites (F5) at Taji Power Station (Baghdad).